A Midwest midstream facility was having trouble cleaning a 10-inch line that sends sour fuel from their location to a processing facility a mile and a half away. The sour gas line was scheduled to have maintenance done while the facility that produces the sour fuel was down for turnaround, but with a major highway running over the line and the line owned and operated by separate entities, coordinating the clean was complex.
The facility contacted Refined Technologies to help remove the high levels of H2S that remained. Within 12 hours of receiving the call, RTI was onsite with chemistry, mechanical and injection equipment, and resources ready to execute. After seeing the line packed with heavy solids, RTI requested the line be cleared of all water with a displacement pig, pushed by N2, prior to work starting.
RTI partnered with the client using a combination of traditional methods coupled with strategic chemistry and proprietary processes, achieving great results. The total timeline was 60 hours, from when RTI received the call to when the clean was complete.